Production

General planning

Industrial building planning from a single source

Are you planning a construction project? Or do you want to expand or consolidate your production, logistics or other areas? You don’t yet know whether brownfield or greenfield is the optimal technical and economic solution for your company?

We are your contact when it comes to industrial building planning.

Our consultants analyze your general planning problem precisely and holistically in order to develop effective solution strategies on this basis, with which you can achieve your goals and successfully implement the construction project. Alongside factory planning, general planning is a crucial step in the realization of industrial construction projects and makes a significant contribution to the result. At Rothbaum, we bring years of experience and expertise to the table and plan your projects reliably, purposefully and environmentally consciously. Both methodically and technically, we are familiar with the latest state-of-the-art solutions across all industries.

Location strategy

Target definition, master plan and risk assessment

Icon of an arrow pointing downwards.
General planning

Manage centrally, implement holistically

Icon of an arrow pointing downwards.
Project management

Coordinated, transparent and goal-oriented

Icon of an arrow pointing downwards.
Step-by-step concept and relocation plan

Plan construction phases and protect ongoing operations

Icon of an arrow pointing downwards.
Construction management

Monitoring progress, active controlling and well-planned transformation processes

Icon of an arrow pointing downwards.
Sustainability

Environmental awareness, energy management and New Work

Icon of an arrow pointing downwards.

Location strategy

The strategic perspective comes before building planning

To ensure that you can successfully implement your construction project in a goal-oriented, economical, timely and long-term manner, it is important that the project is aligned as closely as possible with your corporate strategy and meets your corporate goals and requirements. This includes a feasibility check and the adaptation of your corporate master plan.

All of this is part of a location strategy with which we work with you to ensure that the selection and development of buildings and locations are optimally aligned with your long-term corporate goals. On this basis, we develop a successful campus strategy, which in turn influences strategic building and site planning. With the help of our risk assessment, we ensure that potential problems are identified at an early stage and risk mitigation measures are taken. In addition, we analyze which funding opportunities you can take advantage of and thus ensure that your construction project can be implemented profitably.

Service packages

  • Develop an adapted target definition for the location strategy
  • Align this objective with the company’s orientation
  • Carry out a feasibility check including a site and environment analysis
  • Carry out a risk assessment of the construction project

Your benefit:

  1. You achieve your corporate goals
  2. They ensure that all influencing factors are taken into account and that your construction project harmonizes with your global footprint and production system
  3. They ensure that your construction project is implemented economically
  4. You minimize your risks
Portrait of Philipp Kappus.
Philipp Kappus

Production Manager

Talk to us!

Would you like your future general planning from a single source? Then you’ve come to the right place! Send me your message and I will get back to you as soon as possible.

    General planning

    Everything from a single source, from conception to awarding the contract

    The picture shows a mock-up of a warehouse layout in detailed planning for general planning

    Do you want holistic, complete building planning? And do you want to avoid frictional losses between the individual service phases? We are happy to take on the general planning for you, in which we supervise all planning phases of a construction project. This begins with the building concept, in which the basic ideas and requirements are developed, and extends to the detailed construction plans and the building application through to the tendering and awarding of all trades: from the building to the equipment (machines, systems, storage, etc.) through to IT systems (e.g. ERP, WMS, TMS).

    We always start with an analysis of your very specific technical, organizational and economic requirements in order to develop a comprehensive planning basis that is optimally harmonized with VDI 5200 and HOAI. Our experts use the latest methods such as Building Information Modeling (BIM), process and material flow analysis and 2D/3D modelling. With this building concept, we can then work with you to develop detailed construction plans and prepare the documents required for the building application. General planning from a single source ensures that your construction project is carried out efficiently and professionally from the initial idea through to implementation. In addition, our experts support you with factory planning and logistics planning, ensuring a harmonious overall concept.

    Service packages

    • Developing a building concept
    • Visualizing the building concept using Building Information Modelling (BIM)
    • Prepare preliminary to implementation planning
    • Harmonizing building and factory planning
    • Prepare and draw up building application, amend land-use plan
    • Supporting tendering and awarding

    Your benefit:

    1. You can rely on fully coordinated building planning
    2. All your production and logistics requirements are taken into account
    3. Planning is continuously harmonized with factory and warehouse planning
    4. You have a single point of contact for all planning stages
    5. All steps from concept and master plan to awarding and implementation run smoothly

    Project management

    All the threads come together here

    Planning and building new production or logistics buildings is a major challenge. In order to ensure that the project runs smoothly, it is necessary to coordinate many different trades and specialist areas. This includes precise coordination between architects, engineers, construction companies and other parties involved. But that’s not where the complexity ends: in a project like this, there are financial, time and quality targets that all have to be pursued and met at the same time.

    Our experienced project management specialists have technical and methodological expertise in all areas, from building planning to ramp-up support. If you wish, we can also take on overall project management – our IPMA-certified project managers will be happy to assist you. As independent experts, we also work together with partners (architects, planners, etc.) of your choice, put the necessary services out to tender on a vendor-neutral basis – or are happy to recommend partners with whom we have already worked successfully.

    Service packages

    • Develop and track project schedule
    • Coordinate project activities
    • Ensure communication
    • Continuously monitor trades
    • Adopt cost update

    Your benefit:

    1. You receive results that are in line with your plans, both technically and in terms of time
    2. You have a fixed contact person for all project matters
    3. You gain time for your day-to-day business
    4. You have access to reliable and needs-based information at all times

    Step-by-step concept and relocation plan

    Plan sub-steps, anticipate and solve problems

    Production and logistics are at the heart of your company. However, a construction project can hinder or interrupt these processes and this can quickly have economic consequences for your company. To prevent this from happening, it is therefore important to develop a detailed concept of how production, logistics and other company processes can be maintained during each construction phase and for all relocation steps.

    Together with you, we develop a phased concept and a relocation plan that is continuously updated and adapted during the general planning and its implementation. By carrying out a continuous deviation analysis to determine the critical path, problems and delays can be identified and eliminated in advance. For example, our consultants can use coordinated production planning to ensure that sufficient buffer stocks are available and built up as required. In particular, we ensure that your customers do not notice critical transition phases.

    Service packages

    • Develop a step-by-step plan
    • Develop a relocation concept
    • Integrate planning into the overall construction schedule
    • Create deviation analysis (critical path)
    • Eliminate problems and delays in advance

    Your benefit:

    1. You maintain your business processes
    2. You keep to your schedule without severe restrictions in ongoing operations

    Construction management

    Construction is the first step in the transformation process

    Do you always want to have a clear and complete overview of your project and the construction progress from the start of construction to completion? Our construction management ensures that you maintain an overview from the first cut of the spade to the completion and acceptance of the building.

    We ensure that you always know the current status by providing constant construction supervision, continuous controlling, comprehensive quality management and complete documentation as part of our project management. Even after completion of the construction project, we continue to support you and manage all issues relating to warranties, additional claims and complaints. We are also happy to assist you with any necessary transformation processes that become necessary as a result of the new build, from implementation support to personnel development.

    Service packages

    • Monitor and document construction progress
    • Carry out realization controlling until completion
    • Accompany building acceptance
    • Carry out warranty management
    • Supporting ramp-up operations and transformation processes

    Your benefit:

    1. You always know the current status quo
    2. You have clear contacts throughout, from concept to realization
    3. You can rely on smooth commissioning
    Header image for the blog article "Sustainability in production, logistics and supply chain", shows forest with road from above as an aerial view

    Blog

    Sustainability in production, logistics and supply chain

    Sustainability in operations not only offers the opportunity to make a positive contribution to society and the environment, but also to achieve long-term economic benefits. Read this article to find out what sustainability in operations means and what benefits it brings.

    Sustainability

    Responsible and sustainable construction

    The sustainable use of resources is becoming more and more important and is also increasingly becoming a relevant economic factor. But what does sustainability mean in concrete terms in industrial building planning? How can your existing buildings be repaired in a sustainable and resource-saving manner and what does this look like for new construction projects?

    Our experts will support you in the sensible consideration of sustainability aspects. Together with you, we examine your specific company situation and clarify whether the continued use of the existing building is sustainable and possible, whether renovation is necessary and whether a conversion or a new building (“greenfield”) would be the more sustainable and resource-saving option. Together with you, we examine whether technologies such as concrete core activation, geothermal energy or photovoltaic systems are suitable for your building project. Sustainable campus and building planning with green outdoor areas and climate corridors not only ensures that you become a pioneer in terms of sustainability, it also creates a pleasant working environment and space for modern working methods such as “New Work”.

    Service packages

    • Ensure energy efficiency
    • Ensure material selection is based on sustainability and ecological aspects
    • Using resource-saving construction techniques
    • Selecting durable materials and technologies
    • Preparing for sustainability certification

    Your benefit:

    1. You reduce your company’s CO2 emissions
    2. They increase energy efficiency during operation
    3. You are taking steps towards energy self-sufficient buildings or an energy self-sufficient campus

    You might also be interested in

    Preview image of the “Green Factory” page: shows a production robot arm in the foreground and a forest landscape from above in the background

    Production

    Green Factory

    With our Green Factory approaches, we offer you forward-looking solutions to ensure sustainable and long-term economic success in your factory.

    Learn more

    Preview image of the factory planning page, shows factory construction site from above

    Production

    Factory planning

    Whether greenfield or brownfield, we ensure that your factory is expandable and that you can operate with the greatest possible efficiency, flexibility and operational excellence.

    Learn more

    Preview image of the logistics strategy page: shows an automated guided vehicle (AGV) carrying a parcel and a logistics center from above in the background

    Supply Chain

    Supply chain strategy

    The supply chain strategy describes specific design approaches for all current and future challenges in your value creation network. It is the foundation for successful and sustainable supply chain management: Create the optimal balance between controlled diversity and complexity reduction.