Headerbild zur Success Story Tchibo zur Kostensenkungsanalyse. Das Bild zeigt eine Tchibo-Tasse mit Kaffee.

SUCCESS STORY

Cost reduction analysis

Process and cost analysis of the three plants in Hamburg, Berlin and Marki to develop cost-cutting measures in the coffee production network

Tchibo Manufacturing GmbH is subjecting its manufacturing costs to a regular, critical review in order to increase its overall competitiveness. The aim of the project was to develop effective measures to reduce manufacturing costs and sustainably increase profitability. Together with Rothbaum, a comprehensive catalog of measures was developed in three months.

The comprehensive analysis concept made it possible to identify significant and effective savings potential. The collaboration with the Rothbaum team was extremely satisfactory for me.

Manuel Fliegel, Director Manufacturing, Tchibo Manufacturing GmbH

Tchibo Manufacturing GmbH

  • Tchibo Manufacturing GmbH, based in Hamburg, is the production company of Tchibo GmbH and is responsible for the roasting, blending, grinding and packaging of coffee.
  • The diverse product portfolio, ranging from whole espresso beans and ground coffee to coffee capsules and pods, is produced at the three plants in Hamburg, Berlin and Marki (Poland).
  • With its various brands, Tchibo is one of the market leaders in DACH and Eastern Europe and generated total sales of EUR 3.25 billion (2022).

Services

  • Cost analysis of planning and production processes
  • Manufacturing footprint analyses for cost optimization of the production network
  • Use of process mining and process simulation to identify and quantify process optimization opportunities
  • Development of a catalog of measures with identified potential cost savings

Results

  • Development of 18 measures from the areas of planning, footprint and operations
  • Dedicated list of all required investments and classification of the measures in various strategic development scenarios
  • Creation of packages of measures, each comprising three to six individual measures and offering potential savings in the mid seven-figure range
Portrait of Kai Philipp Bauer, Managing Director at Rothbaum
Dr.-Ing. Kai Philipp Bauer

Senior Manager Supply Chain Management

Talk to us!

Do you have questions about the Success Story or cost reduction programs? Or do you have a specific project inquiry? Then send me your message and I will get back to you as soon as possible.

    Das könnte Sie auch interessieren

    Network optimization in distribution

    To increase efficiency and reduce costs in the supply chain, the existing network structure was…

    Mehr erfahren

    Consulting, planning and vendor selection for the implementation of SAP TM

    We optimized Trotec's transport management processes with consulting, planning and vendor selection for the introduction…

    Mehr erfahren

    Network Design Network logistics

    With Supply Chain Design, an integrated network was developed for the reverse logistics of large…

    Mehr erfahren

    Sprechen Sie uns an!

    Sie haben eine konkrete Projektanfrage oder Fragen zu unseren Leistungen oder Rothbaum? Dann schreiben Sie uns gerne eine Nachricht und wir melden uns zeitnah bei Ihnen. Auf den Austausch freuen wir uns.